總網頁檢視次數

星期四, 12月 30, 2010

2010/12/30 Daily tasks

1. Discuss and process New phone system order
2. Place order for new IDAP lines
3. Check mass email capacity
4. Apply for compensation leave
5. Send material icon demo for HMB
6. Claim Oct, Nov, Dec expense
7. Check PCI Scanning result and generate report

Last working day of 2010 ....

星期三, 12月 29, 2010

2010/12/29 Daily tasks

1. Check and fix network issue between office and datacenter. The H3C duplex is not correct with Auto .. need to set it manually 10 Full for correct speed.2
2. Finish the email for new phone systems and request E to approve.

星期二, 12月 28, 2010

2010/12/28 Daily tasks

1. Fix email problem , too many connection, too many large email
2. Check/fix backend subnet network issue, replace Cisco switch with H3C switch to fix it

星期五, 12月 24, 2010

2010/12/24 Daily tasks

1. Prepare for maintenance
2. Pack for 2 x switch and 3 x APC power
3. Upgrade F5 firmware
4. Relocate servers
5. Replace APC power for single power input device
6. Checking after everything is back .

Work until 23:00

星期四, 12月 23, 2010

2010/12/23 Daily tasks

1. Oracle Flash card demo
2. Discuss phone system proposal with P

2010/12/22 Daily tasks

1. ESI demo

星期二, 12月 21, 2010

2010/12/21 Daily tasks

1. YA AMM
2. HMB Onsite meeting
3. Arrange Dell to come tomorrow to fix Wang's Laptop keyboard problem at 14:00-16:00
4. IT bi-monthly meeting , ask Alex to update the team for all big project and 24 Dec maintenance.

星期一, 12月 20, 2010

2010/12/20 Daily tasks

1. YS AMM
2. WT&T Avaya phone system demo
3. Email list update

星期五, 12月 17, 2010

2010/12/17 Daily tasks

1. Go to watch Mitel phone system demo in afternoon.

星期四, 12月 16, 2010

2010/12/16 Daily tasks

1. Move 7 x Server from datacenter to office
2. Discuss with sale for phone system ..
3. Move seat for Aman.

星期三, 12月 15, 2010

2010/12/15 Daily tasks

1. Talking to different phone suppliers sale for updates of system capacity and functional features. And update quotation as needed .
2. Talk with WT&T sale for IDAP application and migration of phone line.

星期二, 12月 14, 2010

2010/12/14 Daily tasks

1. Review phone quotation and ask questions to sales
2. Discuss about the possible changes to quotation and update the quantity
3. Check with Jack for US Retail PO system UAT
4. Talk to Wang to HMB outsource email newsletter proposal .. and finally HMB has rejected .

星期一, 12月 13, 2010

2010/12/13 Daily tasks

1. Review phone system quotations.
2. Move seat for Connie
3. General full email list for HMB
4. Update F5 for testing setting .

星期五, 12月 10, 2010

2010/12/10 Daily tasks

1. Go to datacenter to check what sever need to move, what single power supply device needed to shutdown in 24 .
2. Prepare DV and netbook for Annual dinner

星期四, 12月 09, 2010

2010/12/09 Daily tasks

1. Receive some final quotation from suppliers , start to review and verify
2. Look into Mitel phone system details.
3. Clean up some table for new joiner and setup power bar

星期三, 12月 08, 2010

2010/12/08 Daily tasks

1. Trouble shoot Palm handheld connection issue, the problem is due to the old application's ip configuration is not clear and it somehow wakes up itself causing conflict to network ..
2. Record for WT&T and NWT invoice
3. Switch AP to 123 subnet to save DHCP IP

星期二, 12月 07, 2010

2010/12/07 Daily tasks

1. Talk to HM for update of their frontpage of HMB
2. Continue to talk to phone system suppliers for details
3. IT AMM
4. Prepare 24 Dec system maintenance schedule ..
5. ask associate to check their DNS server and see what result that they have for the aff.x.bz domain ..

2010/12/06 Daily tasks

1. Talk to phone system suppliers for explanation of our requirements.
2. some user support work.

星期五, 12月 03, 2010

2010/12/03 Daily tasks

1. Check with NS for DNS lookup issue for yxi.bz domain issue. Sometimes, it returns the CDN's CName record instead of A Record.
2. send the CS call flow to supplier for final quotation ..
3. Relocate power bar for KR team so that they won't shutdown other's power easily .
4. Finish the Phone system requirement and send to Supplier for final quotation .

星期四, 12月 02, 2010

2010/12/02 Daily tasks

1. Calculate HMB NOV production fee.
2. Update website performance data
3. Checking UK associate image loading problem . confirm that they cannot reach our F5 when they cannot load our image, checking with NB to see if it is possible that they have blocked the request from their side ...
4. Talk to CS to verify some questions of the call flow chart ..

星期三, 12月 01, 2010

2010/12/01 Daily tasks

1. Draw the CS phone call flow sample for US toll-free
2. Collect and select photo for annual dinner slide show