1. YA monthly meeting
2. talk the initial 9/F expansion plan
3. Check 9/F HGC fiber connection with HGC engineers
4. Ask PacNet to check the datacenter HGC internal connection
5. Ask NWT for March invoice
6. Check with Cheung about their extra equipment requests.
- 4 x barcode scanner
- 4 x PCs
- 2 x Epson LQ300+ II
- 1 x light usage copier
7. Arrange to setup two wordpress testing environment
沒有留言:
發佈留言